StandardsAboutContact
The Gulf Barrel
Saipem-MDC Egypt MoU: An Option, Not Yet a Rig Contract

Saipem-MDC Egypt MoU: An Option, Not Yet a Rig Contract

A non-exclusive MoU opens offshore drilling talks in Egypt, but no rigs, value or timeline are disclosed. Analysis, not advice.

The Saipem and Modern Drilling Company memorandum is an option, not a rig contract. Announced as a non-exclusive MoU for offshore drilling collaboration starting in Egypt, it names no rigs, value or timeline. Its worth depends on whether Saipem and Modern Drilling Company convert it into a joint venture or tendered work.

The Gulf Barrel Desk · 3 min read

Saipem and Modern Drilling Company have signed a memorandum of understanding to assess offshore drilling collaboration, beginning in Egypt, according to Offshore Technology. It is a framework for talks, not an award. No rigs, contract values or durations have been disclosed, so the announcement tells us about intent and positioning rather than new drilling capacity. This is analysis, not advice.

What the memorandum actually commits

The MoU is non-exclusive, which means both companies remain free to pursue Egyptian offshore work with other partners. Offshore Technology reports that it covers identifying business initiatives in offshore drilling services and evaluating cooperation models for each prospect, including joint ventures, consortia or project-specific agreements. A joint coordination committee is to track market changes and outline next steps. Nothing in the reported terms is a binding obligation to bid or to deploy equipment.

Who the two partners are

Modern Drilling Company is an Egyptian contractor offering onshore and offshore drilling and workover services, and is reported to be the former SinoTharwa Drilling Company. Saipem is an international contractor already active in Egyptian waters, with subsea and pipeline installation work reported on the Zohr gas field and the Burullus Phase IV development. The pairing therefore combines a local drilling operator with a contractor that already holds an installation footprint in the country.

Why the signing venue and timing matter

Egypt Oil & Gas reports that the memorandum was signed at the 2026 Mediterranean Offshore Conference and Exhibition in Alexandria by Saipem chief executive Alessandro Puliti and MDC chairman and managing director Tamer Salah. Trade-show signings often signal alignment ahead of tenders rather than a finished deal. The same report says Egypt and Saipem reviewed Phase 12 of the West Delta Deep Marine gas project in January 2026, which is context, not a link to this MoU.

What remains unconfirmed

Financial terms, duration, rig availability and any named project are not in the reported material. Saipem calls Egypt a strategically important market and expects the arrangement to strengthen its presence there, which is the company's own framing. Whether it leads to a joint venture, a consortium bid or nothing at all is open. Until a tender, award or named rig appears, the physical build-out is unchanged by this announcement.

What to watch next

The useful signal is a concrete step: a named tender, a consortium filing, a rig mobilisation or a disclosed contract value. Watch for announcements from Egyptian upstream operators and from the two companies themselves, and for any expansion beyond Egypt, which the MoU allows only if both sides agree. Absent those, treat the memorandum as a marker of intent, sized accordingly, and not as evidence of new Gulf or Mediterranean supply.

What did Saipem and Modern Drilling Company agree?
They signed a non-exclusive memorandum of understanding to assess new collaboration opportunities in offshore drilling, starting in Egypt, with possible expansion to other countries if both agree.
Does the MoU commit either company to drilling work?
No. The reported terms describe an assessment framework and a coordination committee. No rigs, contract values or timelines have been disclosed, so no drilling commitment is confirmed.
Why does it matter for Egypt's gas build-out?
Offshore gas development depends on drilling capacity as well as subsea installation. A pairing of an international contractor with a domestic driller could matter if it leads to bids, but that is not yet announced.
  1. Saipem and MDC sign MoU for offshore drilling in Egypt — Offshore Technology
  2. Saipem and MDC Partner to Boost Oil and Gas Cooperation in Egypt — Egypt Oil & Gas